top of page
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Anthem Ranch Three Tier Lakes Water Feature Repairs
Anthem Ranch's water feature runs through three lakes connected by waterfalls, and a significant breach was eroding the end of the dam. The pump and vault system that circulates the water also flooded and froze repeatedly. DHA helped the community define the repair scope and the engineering scope, secured testing and engineering, and managed the contractor through the dam repairs and a full pump and vault replacement. The feature had been out of service so long that many residents had never seen it running. It has operated smoothly ever since, with no more freezing problems.
bottom of page


