Who Pulls the Permit? Why "You Don't Need One" Is the Most Expensive Sentence in HOA Construction
Your contractor just told you the project doesn't need a permit. That one sentence has cost more HOAs more money than almost anything else I see — and the bill always shows up later, at the worst possible time. Last time I wrote about who draws the plans — when your project needs a design professional and when it doesn't. This is what happens to those drawings next. Between design and construction sits a regulatory layer boards routinely skip past, usually because a contracto
dhaconstructionman
Jul 213 min read