top of page

Competitive Bidding Is Not the Same as Lowest Bidder
A friend with 14 years in defect repair recently posted a different view from mine on how HOAs should procure construction defect projects. Her post makes several points I agree with, so I want to answer it carefully. She is right that the lowest bid doesn't always mean the best value. She is right that a process fixated on the lowest number can produce scope gaps and unnecessary change orders. She is right that collaboration among the contractor, the engineer and the HOA's O
dhaconstructionman
Oct 203 min read
Â
Â
Â
Nobody Bid the Construction Defect Repair
How to make a construction defect settlement fix more of your building Your association spent two or three years on a construction defect claim. Experts opened walls, cut test holes in the roof, and water-tested the windows. The case settled. Now there's a check in the bank and a board that has to turn it into a repaired building. In Colorado, what happens next is almost always the same. The repair goes to the construction company that did the intrusive testing. No bid-ready
dhaconstructionman
Oct 134 min read
Â
Â
Â
🌟 Part 4: The Big Why – Turning Personal Pain into Purpose for HOA Communities 🌟
My wife and I bought our dream home from a major production builder, excited for a fresh start in a beautiful community. I cared deeply about where we lived, so I joined the HOA board as a volunteer. Then reality hit: We discovered significant construction defects. As homeowners, we felt taken advantage of—frustrated, helpless, and unsure where to turn. I stepped up to lead our association through a full construction defect claim, and later, the complex remediation process to
dhaconstructionman
Feb 32 min read
Â
Â
Â
bottom of page
