top of page

🌟 Part 2: Answering the Call – From Navy Blues to Engineering Breakthroughs 🌟
After those formative summers on the jobsite, I forged my own path by joining the Navy. It built discipline, teamwork, and resilience in ways I’ll always carry with me. But in my late twenties, when it was time to choose a college degree, the siren song of construction pulled me back irresistibly. I decided on structural engineering—designing the bones that hold buildings safe and strong. Truth? I’d been a terrible student in high school. Daydreaming through classes, barely s
dhaconstructionman
Jan 201 min read
Â
Â
Â
bottom of page
