Repair or Replace? The Math HOA Boards Skip — and the $38,000 Patch That Bought Two Years
Here's a conversation I've had more times than I can count, in some version, at some community, in some month of budget season. The roof is leaking again. The board gets two numbers: $38,000 to repair the failing sections, or $210,000 to replace it. The room does the arithmetic everyone does — replacement is five and a half times the cost — and votes for the repair. Reasonable. Responsible, even. Nobody wants to be the board that spent $210,000 when $38,000 would do. Two year
dhaconstructionman
Aug 45 min read
The Decision That Happens Before Every HOA Project: Is Your Reserve Study Actually Working for You?
Most of what I write about—bid leveling, contractor interviews, closeout—happens after a board has decided to do a project. But there's a decision that comes before all of it, and it quietly determines whether your community is ready when that roof, those roads, or that pool finally wears out. It's your reserve study. And if it's sitting in a drawer getting dusted off once a year at budget time, it isn't doing its job. Here's the uncomfortable backdrop: an analysis of more th
dhaconstructionman
Jun 303 min read
The Cheapest Board Member in the Room: What I Got Wrong About HOA Reserves
When I first joined my HOA's board of directors, I had one mission: keep the monthly assessments down. I thought I was the hero. Every budget meeting, I was the guy pushing back on increases, looking for places to trim, proud that our dues were lower than the community down the road. I genuinely believed I was protecting my neighbors' wallets. I was doing the opposite. It took me a few years — and a few painful capital projects — to understand that a board obsessed with keepi
dhaconstructionman
Jun 234 min read